Enter values from 0 to 100 (INT array, 100 elements)
Horizontal bar chart
hbar
IAG inputs
Num
Enter the number of bars to display (1-100)
Value
Enter values from 0 to 100 (INT array, 100 elements)
Scatter plot, bubble chart
plot
Description
Plots circles at positions from X=0, Y=0 at the lower left up to X=200, Y=200 (center X=100, Y=100)
The size and color of each plotted circle can be specified
IAG inputs
Plot
Enter position, size and color (array of sPlot structures, 500 elements)
Plot structure
X
X coordinate 0-200
Y
Y coordinate 0-200
Color
Color (0=black 1=red 2=yellow 3=magenta 4=green 5=cyan 6=blue 7=white)
Size
Size 0-200
Visible
Display
Gantt chart
gantt
Description
Each task is displayed as bars on its own row, up to 100 tasks (100 rows) → set the number to display in Num
Up to 100 bars are displayed in total → this is the number of elements of the Gantt structure array
Set the display position in Left and Width with values from 0 at the left edge to 1000 at the right edge, and set the task position (row) in TaskNo
IAG inputs
Num
Enter the number of tasks to display (1-100)
Gantt
Enter task number, position, width and color (array of sGantt structures, 100 elements)
Gantt structure
Visible
Display
Width
Bar display width
Left
Display position of the bar's left edge
TaskNo
Task position where the bar is displayed
Color
Color (0=black 1=red 2=yellow 3=magenta 4=green 5=cyan 6=blue 7=white)
Pareto chart
pareto
Description
Displays 20 + 1 bars (20 items plus one bar for "other")
The maximum bar value is 100, and the cumulative total of the bars is shown as a line chart
The maximum of the line chart is the cumulative value of bars 0-19, excluding "other"
Drawing the chart requires the Refresh flag, so turn the Refresh flag ON after setting the chart Values
Note: keep the Refresh flag ON for at least the update rate set in the NA global variables
IAG inputs
Value
Enter values from 0 to 100 (INT array, 20 elements)
Refresh
Redraw the chart
Band chart
band
* With three parts placed
Description
Displays the ratio of the values of 10 items
Note: keep the Refresh flag ON for at least the update rate set in the NA global variables
IAG inputs
Value
Enter 10 values and display their proportions in a chart (INT array, 10 elements)
Refresh
Redraw the chart
Scatter plot + line
plotline
IAG inputs
Plot
Enter position, size and color (array of sPlot structures, 500 elements)
Line
Enter the start and end positions of the line (array of sLine structures, 2 elements)
Refresh
Update chart
Plot structure
X
X coordinate 0-200
Y
Y coordinate 0-200
Color
Color (0=black 1=red 2=yellow 3=magenta 4=green 5=cyan 6=blue 7=white)